Microsoft’s Azure cloud briefly showed the limits of virtual resilience when several undersea fiber-optic cables in the Red Sea were cut on 6 September 2025, forcing traffic onto longer detours, producing higher-than-normal latency for cross‑region traffic, and triggering urgent...
Multiple undersea fiber-optic cables in the Red Sea were cut in early September, producing widespread internet slowdowns across South Asia, the Middle East and parts of Europe and prompting Microsoft to warn Azure customers that traffic routed through the affected corridor may experience...
azure
bgp routing
cable repair
cloud computing
cross-border traffic
data center
edge computing
global connectivity
internet latency
internet outage
microsoft azure
network infrastructure
network resilience
red sea
routediversity
submarine cable
subsea cables
telecommunication
traffic rerouting
Microsoft’s terse Service Health advisory on September 6, 2025 — warning that “network traffic traversing through the Middle East may experience increased latency due to undersea fiber cuts in the Red Sea” — was the first public signal of a disruption that quickly rippled through global cloud...
Multiple undersea fibre‑optic cables in the Red Sea were severed in early September, producing widespread slowdowns for Internet users and measurable latency for cloud customers — a disruption that exposed how the physical backbone of the Internet can become a single point of failure for modern...
Microsoft has warned that users of its Azure cloud may see higher-than-normal latency and intermittent disruptions after multiple undersea fiber-optic cables in the Red Sea were cut, forcing traffic onto longer alternate routes while repair work and global rerouting continue. (reuters.com)...