Forums
New posts
Search forums
What's new
New posts
New media
New media comments
New resources
New profile posts
Latest activity
Media
New media
New comments
Search media
Resources
Latest reviews
Search resources
Members
Current visitors
New profile posts
Search profile posts
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Windows Forum Community
The Water Cooler
Fukushima nuclear power plant braces for typhoon
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="whoosh" data-source="post: 230526" data-attributes="member: 10901"><p>The Tokyo Electric Power Co. TEPCO hopes to put a makeshift roof over the reactor 3 turbine building at the <a href="http://www.power-eng.com/news/2011/07/1456087982/nrc-panel-recommends-regulatory-overhaul.html" target="_blank">Fukushima Daiichi nuclear power plant</a> in preparation for Typhoon Ma-on.</p><p>The roof would cover a hole caused by a hydrogen blast in March after an <a href="http://www.power-eng.com/articles/2011/06/timeline-of-events-in-japan.html" target="_blank">earthquake and tsunami</a> hit the plant. A hose from the reactor to a barge was disconnected over fears of high waves during the storm. The barge contains relatively low-level radioactive water, according to news reports.</p><p>Typhoon Ma-on reportedly had sustained winds of 100 mph with gusts to 120 mph on July 17 and was moving north-northwest at 12 mph. The storm was expected to make landfall as a Category 1 or 2 storm near Shikoku, about 173 miles southwest of Daiichi.</p><p>Flooding conditions are possible and warnings of high surf and strong winds have been issued for areas along the storms projected path, the article said.</p><p></p><p><a href="http://www.cospp.com/articles/pe/2011/07/fukushima-nuclear-power-plant-braces-for-typhoon.html" target="_blank">Fukushima nuclear power plant braces for typhoon - Cogeneration & On-Site Power Production</a></p></blockquote><p></p>
[QUOTE="whoosh, post: 230526, member: 10901"] The Tokyo Electric Power Co. TEPCO hopes to put a makeshift roof over the reactor 3 turbine building at the [URL="http://www.power-eng.com/news/2011/07/1456087982/nrc-panel-recommends-regulatory-overhaul.html"]Fukushima Daiichi nuclear power plant[/URL] in preparation for Typhoon Ma-on. The roof would cover a hole caused by a hydrogen blast in March after an [URL="http://www.power-eng.com/articles/2011/06/timeline-of-events-in-japan.html"]earthquake and tsunami[/URL] hit the plant. A hose from the reactor to a barge was disconnected over fears of high waves during the storm. The barge contains relatively low-level radioactive water, according to news reports. Typhoon Ma-on reportedly had sustained winds of 100 mph with gusts to 120 mph on July 17 and was moving north-northwest at 12 mph. The storm was expected to make landfall as a Category 1 or 2 storm near Shikoku, about 173 miles southwest of Daiichi. Flooding conditions are possible and warnings of high surf and strong winds have been issued for areas along the storms projected path, the article said. [url=http://www.cospp.com/articles/pe/2011/07/fukushima-nuclear-power-plant-braces-for-typhoon.html]Fukushima nuclear power plant braces for typhoon - Cogeneration & On-Site Power Production[/url] [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Windows Forum Community
The Water Cooler
Fukushima nuclear power plant braces for typhoon
Top