- Joined
- Apr 15, 2009
- Messages
- 47,176
- Thread Author
- #1
Please be aware, this is a live stream and may freeze or be unavailable from time to time.
Throughout the extended top kill procedure – which may take up to two days to complete - very significant changes in the appearance of the flows at the seabed may be expected. These will not provide a reliable indicator of the overall progress, or success or failure, of the top kill operation as a whole. BP will report on the progress of the operation as appropriate and on its outcome when complete.
[video]http://www.bp.com/liveassets/bp_internet/globalbp/globalbp_uk_english/homepage/STAGING/local_assets/bp_homepage/html/rov_stream.html[/video]
Throughout the extended top kill procedure – which may take up to two days to complete - very significant changes in the appearance of the flows at the seabed may be expected. These will not provide a reliable indicator of the overall progress, or success or failure, of the top kill operation as a whole. BP will report on the progress of the operation as appropriate and on its outcome when complete.
[video]http://www.bp.com/liveassets/bp_internet/globalbp/globalbp_uk_english/homepage/STAGING/local_assets/bp_homepage/html/rov_stream.html[/video]