Thieves tunnel under cash machine, at Blockbuster in Fallowfield shopping precinct, Manchester

whoosh

Cooler King
Staff member
Premium Supporter
The gang spent six months tunneling but got there timing wrong . The cash machine only contained £6,000 . The thieves had to drill through more then 15 inches of concrete to reach the cash.
The tunnel was over a 100 feet in length .

:scratch:
 
Last edited by a moderator:
Back
Top