hi,
This should be an easy answer. I want to create one scheduled task, it will be called "CLEAR_PHOTOSBYDATE", see attached pic or (approximate example, not literal job...yet)
In this task I will have several batch jobs. I know how to set it up to run them consecutively, 1st one runs, the 2nd will not run till first completes. I want it to kick of the first batch job, then immediately kick off the 2nd, 3rd etc., I want to run them all at once in parallel.
How is this done?
Thanks James.
This should be an easy answer. I want to create one scheduled task, it will be called "CLEAR_PHOTOSBYDATE", see attached pic or (approximate example, not literal job...yet)
In this task I will have several batch jobs. I know how to set it up to run them consecutively, 1st one runs, the 2nd will not run till first completes. I want it to kick of the first batch job, then immediately kick off the 2nd, 3rd etc., I want to run them all at once in parallel.
How is this done?
Thanks James.